Our Construction Monitoring Areas:
• Pre-Construction Survey
• Construction Monitoring Plan and Protocol
• Crack Monitoring
• Vibration Monitoring
• Optical/Displacement Monitoring
Depending on type of project filing, building location and surrounding area in New York City, the building existing condition surveying and monitoring must be completed prior to construction & must compliant with the TPPN 10/88 Technical Policy.
The Technical Policy and Procedure Notice # 10/88 (TPPN 10/88) of the New York City Department of Buildings (NYCDOB) requires for surveying and monitoring of all landmark buildings located on a 90’ radius of a job site in New York City. Vibration Monitoring Equipment and Existing Conditions Photographic Surveys are the steps and procedures needed to take when it comes to complying with this strict construction code.
Initial construction phases, primarily demolition and foundation work, are known to create and emit vibration shocks that affect nearby structures, where Landmark buildings, due to their years of existence, might well be significantly affected. As a result, building vibration, optical and crack must be monitored.
Vibration Monitoring may, and is mostly used, for some of the following construction activities and/or scenarios by using Wireless Vibration Monitoring or Manned Vibration Monitoring:
• Construction
• Excavation
• Demolition
• Dynamic Compaction
• Pile Driving
Monitoring is provided to ensure that no negative effects are caused by the construction process. Vibration and Displacement Monitoring are particularly critical when performing underpinning activities, site excavation, or other soil work as part of the foundation construction and design.
Data analysis and evaluation are performed immediately following data collection in order to calculate displacements. Vibration peak particle velocity is constantly monitored to immediately determine extents of movement and displacement relative to the predetermined criteria. The project team is notified immediately of any
exceed outside of the predetermined limits. Ultimately, HRF Team provides the client and the project team with the information necessary to conduct the project work in a safe, efficient, and cost-effective manner with minimized impacts to neighboring properties.